VT Engineering designed the streetlighting for a whole new 22 lot sub-division in Mission. This included a new road that goes through the whole sub-division as well as street lighting in front of the sub-division on Cherry Avenue. The new local road was required to have 3000k lighting and the existing arterial road was required to have 4000k lighting. All the street lighting was modelled using AGi32 to ensure all the lighting requirements where met and all the streetlights were spaced in a way to provide even lighting throughout the whole street.